NH 101A Widening

The City of Nashua has entered into a contract with NRPC to manage the engineering and design phase of the widening of NH 101 A from Celina Avenue to Somerset Parkway in Nashua. The RFP procurement process began in November of 2005 and a contract was signed between the City of Nashua and McFarland-Johnson Inc. Since this time, the Nashua Regional Planning Commission has worked closely with the City of Nashua and McFarland-Johnson to manage the engineering and design and environmental elements of the widening.

During the peliminary design phase a public process was conducted to obtain input from landowners, residents and travelers of the corridor. This culminated in a public hearing on August 18th, 2008 followed by a meeting of the appointed 101 A Special Committee on February 17, 2009. At this meeting, the Special Committee voted to proceed with the final design and construction phases of the project. Final design is anticipated to begin in Spring of 2010. For more detailed information, please review the documents below.

Public Meeting 2.17.09 | Public Hearing 8.18.08 | Public Info Session 4.10.07
NH 101A Corridor Master Plan & Improvements Program | Additional Documents | Contact Us

 
Public Meeting 2.17.09

Report of the Mayor
Notice of Public Meeting

back to top

 
     
Public Hearing 8.18.08

Legal Ad
Right of Way Information

Engineering Documents
Draft Engineering Report (314 KB)
Project Layout Map 1 (7.4 MB)

Project Layout Map 2 (8.0 MB)
Project Layout Map 3 (7.8 MB)
Engineering Drawings (4.5 MB)
Potential Property Connection Map 1 (7.5 MB)
Potential Property Connection Map 2 (8.1 MB)
Potential Property Connection Map 3 (7.9 MB)
NRPC Minutes (643 KB)
Traffic Report (201 KB)
Traffic Report Appendix (2.1 MB)

Environmental Documents
Environmental Study Final Draft (110 KB)
Project Layout Map 1 (7.4 MB)
Project Layout Map 2 (8.0 MB)
Project Layout Map 3 (7.8 MB)
Typical Section Drawing (72 KB)
Appendix A - Noise Impact Assessment (3.8 MB)
Appendix B - FEMA Map (220 KB)
Appendix C - Resource Agency Correspondence & Minutes (1.2 MB)
Appendix D - US Census Map & Data (142 KB)
Air Quality Data (6.9 MB)
Archeology Report (7.7 MB)
HazMat Report (1.0 MB)
Note ~ Historical Report, Resource Constraints, and Water Quality Sample Location Maps are too large for web viewing. Please visit NRPC offices to view hard copy.

Landscape Documents
Planting Concept 1 (6.2 MB)
Planting Concept 2 (10.9 MB)
Planting Concept 3 (10.4 MB)
Planting Concept 4 (10.7 MB)
Planting Concept 5 (10.1 MB)
Planting Concept 6 (10.6 MB)
Planting Concept 7 (8.5 MB)
Roadway Section 1 (453 KB)
Roadway Section 2 (448 KB)

back to top

   
Public Info Session 4.10.07

Presentation
Meeting Summary

back to top

   
NH 101A Corridor Master Plan & Improvements Program

101A Master Plan & Improvements Program, Final Report | 2002
VHB Action Plan Recommendations, pg 1-20
VHB Action Plan Recommendations, pg 21-30
VHB Action Plan Recommendations, pg 31-35
VHB Action Plan Recommendations, pg 36-40
VHB Action Plan Recommendations, pg 41-52

back to top

   
Additional Documents

Improvement Concept Map
Project Introductory Presentation
Roadway Typical
Statement of Purpose & Need

back to top

   
Contact Us

Giuseppe "Joe" Mendola ~ City of Nashua, Division of Public Works, 603.589.3210
Camille Pattison ~ NRPC, 603.424.2240 X14

back to top

   
         
     
 
Search
Links

Nashua Regional Planning Commission
9 Executive Park Drive, Suite 201
Merrimack, NH 03054
Phone ~ 603.424.2240 | Fax ~ 603.424.2230

Exchange | Remote